|
Arlington National Cemetary
Since 1996, the staff at Rox Engineering has been providing a wide range of environmental planning and compliance services for Arlington National Cemetery. Under this contract, we have accomplished the following:
- Performed identification of asbestos, lead paint, and PCBs in eight (8) buildings
- Developed Sample and Analysis Plan (SAP) for post demolition testing
- Conducted Phase II Site Characterizations for residue pesticide and petroleum products
- Performed pre-demolition TCLP (Lead) sampling of the solid waste streams
- Managed abatement of asbestos and PCB
- Installed monitoring wells and monitored groundwater contamination
- Conducted First Responder Awareness/HAZCOM training.
- Performed Pollution Prevention (P2) inventories and prepared a facility Pollution Prevention Plan
- Prepared and filed SARA Title III (Tier II/TRI Form R) documentation to comply with annual EPCRA reporting requirements
|